Interior build-outs
Taking a commercial space from shell or strip-out through to finished and ready to open.

Interior build-outs and fit-outs: taking a commercial space from shell or strip-out to finished.
Taking a commercial space from shell or strip-out through to finished and ready to open.
Reworking an existing space for a new use, a new layout or a new tenant.
Stone-clad service counters, bars and built-in cabinetry, built and installed on site.
Commercial-grade flooring, with the subfloor prep and transitions underneath it.
Partitions and ceilings framed, hung, taped and finished, then painted.
Interior doors, frames and hardware, and the openings they sit in.
A full interior build-out on the ground floor of The Cooper: the plasterwork, the marble service counter and espresso bar, the millwork, the lighting and the polished concrete floor. The first two frames are the same counter, part-built and then finished.



An infrared fitness studio in the Village Green Shopping Center. Plywood panels in an orange steel grid, cedar-clad rooms, large-format tile, lockers, signage. Shot on site.






Both are on the projects page in full, along with underground pipework beside a commercial building. Roofing is taken on for commercial buildings too, and has its own page.
Every interior build-out runs roughly this order, whoever is holding the contract. Delays tend to land at the handoffs rather than in the middle of a trade.
A demising wall is the wall between your space and somebody else’s, or between your space and common area. It normally runs all the way up to the structure above rather than stopping at the ceiling, it normally carries a fire rating, and it is normally where the sound requirement lives as well. An interior partition divides rooms inside your own space and can often stop at the ceiling grid, which is fine for privacy and close to useless for sound: the space above the ceiling runs on from one room to the next, so the noise goes over the top of the wall.
If quiet matters anywhere in your layout, say so before anything is framed. A wall taken to the deck, insulated, with its joints sealed, is a different wall from one that dies at the grid, and it is not a change anyone makes afterward without opening the ceiling back up.
Worth getting in writing from everyone you ask, so the numbers compare:
Mechanical, electrical and plumbing usually follow partitions, and all three are separately licensed in Illinois. HVAC and electrical are licensed by the municipality rather than the state, so which license applies depends on the town the building is in. Include those items when you send the scope.
Against one drawing set, three bids are usually pricing three different jobs. Most of the gap sits in four places, and none of them is the hourly rate.
Send everyone the same drawings at the same revision, set the allowances yourself at the same number for all three, and ask each one for its exclusions as a written list rather than as a conversation. Then read the breakdown instead of the total. A number with no breakdown is not a lower price, it is less information.
How long a job takes depends on its size, what is found once the old material comes off, material lead times, and weather. You’ll get a timeline with your estimate.
Permits: permit requirements are set by the village or city where the property sits, and they differ from one to the next. We’ll tell you what your job needs at the estimate.
Interior build-outs and tenant improvements: demising and partitions, ceilings, flooring, counters and millwork, doors and glazing, and the drywall and paint that ties it together. The commercial jobs on the projects page run from a full cafe interior to underground pipework beside a building. Send the building and the scope and you'll get a straight answer on whether it's a fit.
Usually. Neighboring tenants stay open, so the work gets staged and sequenced around them, dust and noise get contained, and the loud work goes where it causes least trouble. Say what the constraints are early and they shape the schedule.
Most commercial work sits under a landlord's rules as well as the village's: approved hours, protected routes in and out, insurance certificates naming the building. Tell us who the property manager is and what the lease requires, and that gets built into the plan rather than discovered halfway.
Permit requirements are set by the village or city where the property sits, and they differ from one to the next. Commercial work is more likely to need one than residential, and a change of use almost always does. We'll tell you what your job needs at the estimate.
It is the part of the lease that splits the build between landlord and tenant: what gets delivered with the space, what the tenant builds, and what an improvement allowance will actually reimburse. Two contractors making two different assumptions about where that line sits will hand you two different numbers for the same room. Send the work letter with the scope and it stops being an assumption.
Somewhere, it usually is not. A ceiling comes down and there is duct where the new wall goes, or the slab will not take drainage where it was drawn. What matters is whether the estimate in front of you already says who carries that: an allowance, a unit rate, or a written change order with a named approver. Ask every bidder which of the three they use, before anyone opens a ceiling.
Replacements, leak repair, storm damage, gutters and ventilation for homes and commercial buildings.
Water supply, drainage and waste, water heaters, HVAC, electrical, and waterproofing.
Kitchens, bathrooms, basements and additions, plus decks, siding and garages.
Estimates are free. Call or send a message.